Working with a studio

EU Data Act: cloud switching charges end on 12 January 2027

From 12 January 2027 a cloud provider may not charge you for switching to another provider, data egress included. What this does not change, and what to check in contracts and your exit plan.

FSM Studio · · 5 min read

Two clouds, terracotta and blue, with an arrow between them

If your company’s data, website or software lives in the cloud, one date is worth a calendar entry: 12 January 2027. From then on a provider may not charge you for moving to another provider or to your own infrastructure. This is set out in the EU Data Act and covers data egress charges during the switch.

What Article 29 says

Article 29 of Regulation (EU) 2023/2854, the Data Act, is titled “Gradual withdrawal of switching charges”. It provides:

  • From 12 January 2027, providers of data processing services shall not impose any switching charges on the customer for the switching process (Article 29(1)).
  • From 11 January 2024 to 12 January 2027, providers may impose reduced switching charges that must not exceed the costs directly linked to the switching process concerned (paragraphs 2 and 3).
  • Before the contract is signed, the provider must give clear information on standard service fees, early termination penalties and any reduced switching charges that may apply (paragraph 4).

“Switching charges” are defined in Article 2(36) as charges, other than standard service fees or early termination penalties, imposed for the actions the Regulation requires for switching to another provider or to on-premises infrastructure, including data egress charges (Regulation (EU) 2023/2854, EUR-Lex).

Some summaries mention “September 2027”. That belongs to a different chapter of the Regulation (Chapter IV), not to switching charges.

What it covers and what it does not

A “data processing service” is defined broadly: a digital service giving access to a shared pool of configurable computing resources. The recitals name three delivery models: IaaS, PaaS and SaaS. So it can reach not only servers but also subscription software that holds your data.

What Article 29 does not change:

  • Standard service fees. A switching charge is not the same as the monthly subscription or ordinary data transfer. The Regulation excludes standard fees from the definition.
  • Parallel use. If you run two services side by side, the provider may charge for data egress, but only to pass on its costs, without exceeding them (Article 34(2)).
  • Custom-built services. The obligations do not apply to services where most main features were custom-built for one customer and which are not offered at broad commercial scale (Article 31).
  • Your own work. The fee goes away, but someone still has to arrange the data in the new place.

What the Digital Omnibus is discussing

The Commission’s Digital Omnibus proposes amendments to the Data Act. A Greenberg Traurig briefing of 15 July 2026 reports two narrow transitional exemptions for contracts concluded on or before 12 September 2025: adapted standard services, and small and mid-sized providers of non-infrastructure services. The same briefing notes that Article 29 stays applicable in both cases, that this is a proposal rather than adopted law, and that it is unclear which switching-related charges could still be levied after 12 January 2027 (Greenberg Traurig, 15 July 2026). Check whether the text has changed before you rely on it: negotiations continue.

What to check in your contracts

  1. List your cloud services. Hosting, servers, email and CRM services, backups, subscription software. For each, note the provider and the contract end date.
  2. Look for switching fees. Does a contract charge for data export, migration or help with the switch? Test such clauses against Article 29: from 12 January 2027 the switch itself may not be charged.
  3. Check the timelines. The Regulation requires the contract to allow switching without undue delay and within a mandatory transitional period of at most 30 calendar days after the notice period. The maximum notice period may not exceed two months (Article 25).
  4. Exportable data. The contract must list the categories of data and digital assets that can be ported. The provider may exempt data specific to its own service’s internal functioning where there is a risk to trade secrets (Article 25).
  5. Retrieval period. At least 30 calendar days after the transitional period, followed by full erasure.
  6. Try an export. If you can, run a test export now. What it costs, how long it takes and whether the format is usable is the best evidence that an exit plan exists.

An exit plan that works without the law

Removing the fee does not make leaving easy. The real obstacle is usually that nobody knows what data sits where and in what format. A one-page exit plan should record what data, where, in which format, who is responsible, and how long a move would take. On ownership of code, domain and data, see who owns your code, domain and data; for the choice between subscription and custom build, see custom software or SaaS.

How to decide

If you have cloud contracts with exit or egress fees, send your provider a question now and check whether the new date is reflected. When you renew, ask for the switching terms in writing. If you have no exit plan, write one before you need it.

We build web projects and systems where the code and data are yours. If you want to review your cloud services or write an exit plan, discuss your project.

This article is not legal advice. For a specific contract, ask a lawyer.

Sources